Ohop Restoration Construction Photos: August 10th-14th


These photos show on-site construction progress of the Ohop Valley Restoration Project for the week of August 10th through the 14th. Highlights include:

  • Staging of Large Woody Debris (LWD) for the area upstream of Hwy 7.
  • Beginning excavation and grading of the Side-channel Ditch.
  • WADOT Specified Streambed Cobble

Information and Links

Join the fray by commenting, tracking what others have to say, or linking to it from your blog.


Other Posts

Write a Comment

Take a moment to comment and tell us what you think. Some basic HTML is allowed for formatting.

Reader Comments

Nice website to track project progress!

Recommend that the photo size be reduced to about 1,000 pixles wide and that about 25% JPEG reduction be applied before posting. No need to post the photos in the full 20 megapixel or so size.

Would like to see some more current construction pictures!

Melinda,

Good timing! New photos were just uploaded of porject construction as well as the Highway 7 fish out…enjoy!

Thanks for looking ;)

Kim

Bill,
Good call, I did reduce the photo size for the newly uploaded construction photos. Thanks for your feedback.

Kim

Tara,

Check out new uploaded photos and the freaky fish out!
Cheers,
Kim